Industry:  Manufacturer of joint restraint products for ductile iron and PVC pipe.

Issues:   This manufacturer was building a new facility to support its growth.  They were already using Cleveland Tramrail™ in areas of their current facility but also used fork trucks and hand pallet jacks to support the systems which proved to be very inefficient and unsafe.

Situation:  The customer was already confident with the long wear life and reliability of the Cleveland Tramrail™ Systems but wanted to avoid the usage of fork trucks and pallet jacks in the new facility. To accomplish this, they planned for cranes that interlock with each other for the new facility.  Interlocking systems improve the flow of materials through the finishing process.

Cranes Chosen:  2 Ton and 5 Ton capacity systems with 2 bridges each, 43' spans and 150' long runways.  The systems are parallel to each other and bridges can be joined together via an interlock/discharge cross over structure.   

The customer also installed Cleveland Tramrail™ sytems in two other areas of the new building and have yet another area in the plant that they will be ordering more Cleveland Tramrail™ for.

Results:  The customer is very happy with the systems that were installed and their productivity and safety have increased within the facility.  They look forward to future business with Cleveland Tramrail™.