Case Studies



Business:  Primary Metal - Iron Pipe Foundry

Application:   The cranes handle patterns and flasks used to make ductile iron fittings. They are used to prepare each pattern/flask combination for entry to a mold conveyor line where they will be filled with sand and drawn out for molding.

The Problem:  This line had a severe lack of material handling equipment.  Pieces were often being moved with forklifts 3-4 times to accomplish the task of preparing the flasks for the mold loop.

Alternatives: 

  • Continue to use forklifts
  • A new very expensive mold conveyor loop  

Results:  With the addition of the Cleveland Tramrail™ Systems what used to take 3-4 moves, usually with a forklift, now only takes two moves and hourly output has increased 50%.  With this increase the Cleveland Tramrail™ systems have already paid for themselves. 

Cleveland Tramrail - By Gorbel Inc.   |   593 Fishers Run   |   PO Box 593   |   Fishers, NY 14453-0593 USA
Phone: 585-924-6262 (US & Canada: 866-4-PTRACK (866-478-7225))   |   Fax: 585-924-6273 (US & Canada: 800-828-1808) Comments, Suggestions or Feedback on the website? Feel free to e-mail the webmaster!  © 2002